The Projects

New Nampa Bridge on Hwy 2

The bridge just outside of Nampa, part of highway 2 to Peace River. was removed and replaced with a much larger bridge over the summer and fall of 2014. Hell ‘N’ Back Welding was contracted several times to complete CWB certified structural welding on the bridge, working for Surespan out of Vancouver. A lot of the work was completed from a manbasket dangling over the river below.